Marine Surveys – The Process


The following is generally the  procedure followed when completing a pre-purchase survey of a sailing vessel.  Power boat are generally the same except the rigging, sails and extusions.

The survey is broken into 4 catagories.  50% of the survey cost is collected in advance.

Topsides

Topsides to include deck, fasteners, bedding, and equipment.  Rigging, both standing and running, sails, mast and boom.  These findings are discussed with the buyer.  If the buyer decides to terminate the survey at this time, we agree on an hourly rate for time spent. No written report is prepared.

In Water Inspection

In water inspection, includes interior, structural, all systems,(electrical, plumbing, electronics and equipment stored aboard.  If the buyer decides to terminate the survey at this time, we agree on an hourly rate for time spent. No written report is completed.

Mechanical

Mechanical, oil analysis if requested, temp readings, complete engine sounding,  vibration, hoses, clamps, belt alignment to accessories, misc.  Operation of engine prior to sea trial, fuel inspection, oil, water, and misc.

Sea Trail

Arrange for sea trial.  Check mechanical operation, sailing abilities.  This will be handled by myself or a compantant skipper.  At the end of the sea trial, the vessel is delivered directly to the haul out yard, depending on buyers satisfaction with the inspections to this point.  The buyer is responsible for the cost of the haul out in advance of pulling the vessel and payment of the sea trial time.

The vessel will be hung and allowed to dry for a few hours before under water inspection.  Random sounding and moisture reading will be taken.  Underwater mechanical inspected.  Blisters, impact areas noted.  General condition of antifouling and zinc anodes.

Either the same day or the following morning the vessel will be returned to the water and placed back in it’s berthing.  If the buyer elects, the vessel can be transferred from sling hang time to one of the contractors for repairs or painting depending on time and space available. 

The final written report, including condition, market valve, and estimate for needed repairs will be delivered within 48 hours.